Achieving great things together: How GSW and HIS are revolutionizing the cabling of solar parks

written byTizian MartinekProject Story

"When I walk through the plant today and see how smoothly everything is running, it makes me really proud," says Michael Langner with a satisfied smile. As a cabling expert at GSW Gold Solarwind, he knows the challenges of large solar projects only too well. "In the past, cabling was often the point that gave us headaches. Today, it is one of our biggest success factors."

From Challenge to Opportunity

The story begins with a problem that many in the industry are familiar with: solar parks are getting bigger and bigger, their shapes are becoming more complex. Where manageable, rectangular areas were once standard, today extensive systems extend over irregular terrain. "With each new project, the challenges of the cabling grew," Langner recalls. "Different cable lengths, different sections - that not only meant more work, but also a higher risk of error."

The turning point: tailor-made solutions meet real partnership

The collaboration with HIS marked a turning point. "What impressed us from the start was not just the technical solution with the pre-assembled cable harnesses," emphasizes Langner. "It was the way the HIS team made our challenges their own."

The individual cabling was tailored precisely to GSW's needs. Each cable harness is manufactured specifically for the project and color-coded. "When you see our fitters today, you can literally feel their relief. Where there used to be stress and worry about mistakes, you now see relaxed faces and efficient work."

Success that can be measured

The results speak for themselves: significantly reduced installation times, minimized error rates and optimized personnel deployment. But for Langner, something else counts: "The smooth communication, the quick feedback, the feeling of having a partner who thinks along with you - that makes the real difference."

A partnership that bears fruit

The collaboration between GSW and HIS shows what is possible when technical expertise meets a real partnership mentality. Every project begins with an intensive dialogue. The requirements are evaluated together, solutions are developed and optimized. "It is this mixture of technical precision and human proximity that makes our projects so successful," summarizes Langner.

Together into the Future

The story of GSW and HIS is far from over. With every project, experience grows, with every challenge, innovative strength. "When I think about what we have already achieved together and what still lies ahead of us, it makes me confident," says Langner. "With HIS, we have not only found a supplier, but a partner with whom we can actively shape the future of solar energy."

Would you also like to benefit from a partnership that offers more than just products? Let us overcome the challenges of your solar projects together.

Related posts

Eine Floating-PV Anlage auf einem See in Holland

The right products for complicated applications: Floating PV systems in Holland

Floating PV systems open up new possibilities for utility-scale PV installations, for example for hydroelectric power plants and treatment, irrigation reservoirs or aquaculture farms. They offer higher power generation through cooling of the water and reduced dust formation, less line losses and environmental impact.

Learn more
Ein Blick in die Produktion von IW-Gussputz

IW Gussputz increases profits and saves €45,500 a year through peak shaving and energy trading

IW Gussputz, a well-known metalworking company near Darmstadt, was faced with rising production costs due to its high energy requirements. As electricity prices rose, so did operating costs, so a way had to be found to ensure stable and predictable energy prices in the long term.

Learn more

Witznitz Energy Park: Efficient realisation thanks to pre-assembled cable systems

With nearly 3,000 kilometers of pre-assembled solar cables—equivalent to the distance from Leipzig to Cairo—the Energiepark Witznitz sets new standards in the execution of large-scale PV projects. The successful collaboration between MOVEON Energy and HIS demonstrates how proven technology and a partnership-driven approach enable efficient realization of projects of this scale.

Learn more
Bild vom Philippsee mit Floating PV-Anlagen kurz vor der Installation im Wasser

Germany's Largest Floating PV Project

The Philippsee near Cottbus impressively demonstrates how innovative technologies are driving the energy transition forward. On this water body, Germany's largest floating solar power plant is being constructed—a project that sets unique technical requirements, particularly in the area of cabling.