With nearly 3,000 kilometers of pre-assembled solar cables—equivalent to the distance from Leipzig to Cairo—the Energiepark Witznitz sets new standards in the execution of large-scale PV projects. The successful collaboration between MOVEON Energy and HIS demonstrates how proven technology and a partnership-driven approach enable efficient realization of projects of this scale.

Efficient Planning as the Foundation

The key challenge of a project of this magnitude lies in the precise coordination of all components. Leveraging the proven HISkon+ technology, the cable systems were pre-assembled to exact specifications and delivered on schedule. Close collaboration between the project teams ensured optimal adaptation to the specific project requirements.

Optimized Processes in Execution

The pre-assembled wiring harnesses were manufactured in the factory to the highest quality standards and labeled with clear markings. This systematic preparation delivered immediate benefits on-site: installation times were significantly reduced, as the ready-to-use wiring harnesses could be laid directly. A structured logistics concept ensured demand-driven deliveries aligned with the construction progress.

Proven Technology Meets Large-Scale Project

The HISkon+ system has proven itself in numerous projects. At the Energiepark Witznitz, this expertise was applied on a larger scale, showcasing its full range of benefits. The standardized pre-assembly processes ensured consistently high quality across the entire project volume.

Collaborative Partnership as a Success Factor

The seamless execution of the project was largely based on close coordination between MOVEON Energy and HIS. Regular exchanges and transparent communication allowed for flexible adaptation to project requirements and significantly contributed to the efficiency of implementation.

Pioneering Insights

The successful implementation of the Energiepark Witznitz highlights the potential of modern pre-assembly for large-scale solar projects. The experiences gained from this project are directly integrated into the continuous development of our systems, providing a solid foundation for future projects of this scale.

Planning a solar project? Our experts are happy to advise you on the possibilities of pre-assembled cable systems tailored to your specific requirements.

Conclusion: Tailored for Success

Investing in customized cable solutions is a fundamental cornerstone for optimizing modern PV systems. Far beyond a simple technical enhancement, this holistic approach sets new benchmarks in system efficiency through the synergistic combination of precise planning, high-quality components, and professional execution.

Early integration of cable optimization into the planning process maximizes the achievable benefits and lays the foundation for sustainable system operation. These tailored solutions have evolved from being an option for specialized requirements to becoming an essential standard for forward-thinking PV projects that demand the highest levels of efficiency and reliability.

Related posts

Eine Floating-PV Anlage auf einem See in Holland

The right products for complicated applications: Floating PV systems in Holland

Floating PV systems open up new possibilities for utility-scale PV installations, for example for hydroelectric power plants and treatment, irrigation reservoirs or aquaculture farms. They offer higher power generation through cooling of the water and reduced dust formation, less line losses and environmental impact.

Learn more
Ein Blick in die Produktion von IW-Gussputz

IW Gussputz increases profits and saves €45,500 a year through peak shaving and energy trading

IW Gussputz, a well-known metalworking company near Darmstadt, was faced with rising production costs due to its high energy requirements. As electricity prices rose, so did operating costs, so a way had to be found to ensure stable and predictable energy prices in the long term.

Learn more
Bild vom Philippsee mit Floating PV-Anlagen kurz vor der Installation im Wasser

Germany's Largest Floating PV Project

The Philippsee near Cottbus impressively demonstrates how innovative technologies are driving the energy transition forward. On this water body, Germany's largest floating solar power plant is being constructed—a project that sets unique technical requirements, particularly in the area of cabling.

Learn more

How GSW and HIS are revolutionising the cabling of solar parks

"When I walk through the plant today and see how smoothly everything is running, it makes me really proud," says Michael Langner with a satisfied smile. As a cabling expert at GSW Gold Solarwind, he knows the challenges of large solar projects only too well. "In the past, cabling was often the point that gave us headaches. Today, it is one of our biggest success factors."

Learn more